INTRODUCTION:
Permits to work are used to control high risk work activities, such as hot work, work at height, confined spaces work etc. Method statements are used in many industries, again as a control measure to detail the correct and safe sequence for work operation.

OBJECTIVES:
The purpose of this training  is to help in determining if a job requires a work permit due to ESS&H hazards, system complexities, or work coordination needs.  If the job already has an established work procedure or has been reviewed and defined as “Worker Planned” work due to the training and qualifications of the crafts person or technician, then the checklist is not needed.

TRAINING MATERIAL OUTLINE:

  1. Overview of safe systems of work
    • Human Engineering
    • Machine and Tools guarding
    • Behavioral factors
  2. The purpose of permits and method statements
    • ESS&H or Other Permits Needed
    • Safety, Security and Facility Concerns
    • Environmental/Waste Concerns
    • Radiation Issues
    • Complexity/Uncertainty Issues
    • Work Coordination
  3. Permit to work systems
  4. Use of the documents in practice
  5. Document templates will be provided to all delegates during the course.

FACILITIES

  • Certificate, Quality Training Kit (Pencil case: Erase, Bolpoint, Pencil, Tipe X, Stabillo, Flash Disk 8 GB), Bag.
  • Training Material (HandOut & SoftCopy)
  • Convenient training facilities in stars hotel
  • Lunch and Coffee Breaks
  • Souvenir

Permintaan Brosur penawaran Training ( Harga, Waktu dan Tempat) silahkan Menghubungi kami.

Catatan :

  • Pelatihan ini dapat di-customized sesuai kebutuhan perusahaan Anda bila diselenggarakan dalam bentuk In-House Training. Untuk permintaan In-House Training dengan jenis topik lainya, silahkan mengirimkan ke alamat email yang tercantum di web kami.
  • Request Training. Jika anda membutuhkan informasi pelatihan yang belum tercantum pada website ini, atau anda ingin memberikan usulan materi yang sesuai dengan tingkat kebutuhan perusahaan anda, silahkan mengirimkan ke alamat emailyang tercantum.
  • Bila tidak ada tanggal dan waktu atau yang tercantum sudah kadaluarsa didalam artikel mohon tanyakan kepada kami untuk jadwal terbarunya.
  • Peserta bisa mengajukan Tanggal Pelatihan / Training selain yang tertera pada silabus penawaran.
Advertisements